Release cycles are not calendar cycles. It was 1.5 years between 5.1 to 5.2 and 4 months between 5.2 and 5.3. So the timing is not uncommon with a mature product. Major driving factors are Exchange versions and feature requests.
Release cycles are not calendar cycles. It was 1.5 years between 5.1 to 5.2 and 4 months between 5.2 and 5.3. So the timing is not uncommon with a mature product. Major driving factors are Exchange versions and feature requests.