This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Start Multiple jobs with Metalogix Essentials

Would like to know, if is there any way to input CSV files to Metalogix Essentials to�start multiple jobs so that I can run multiple team site migrations with few clicks ( rather than starting each job induvial).

FYI. I have to migrate more than 300 sub sites ( at the same level )

  • Hi Dolly,

    The option to modify the shred size has been removed in newer StoragePoint versions as it is not a recommended practice. StoragePoint relies on SharePoint's shredding configuration.

    Regards,

    Cyrus