So I have a shiney new DL4300 which I have connected to my VMware Vcenter server and I have made tentative steps setting up snapshots and schedules.
However I don't really feel like I know what I should be setting these to ? Should I be doing hourly snapshots of all my servers ? Should I try and stagger the snapshots through an extensive series of off-set schedules ? I need to have a different schedule to back up my vCenter server as doing that at the same time as any other server caused major problems with snapshots not being cleared from the VMWare host correctly.
Feeling a bit clueless on this!